4. Executing a reinforced concrete structure
Four operations are required to build a reinforced concrete structure:
formwork ;
reinforcement ;
concreting ;
demoulding and stripping after the concrete has hardened.
4.1 Formwork
This is where the "mold" and props are installed.
SCROLL TO TOP4.2 Reinforcement
This is where the reinforcement is placed.