Preparing for execution
Préfabrication - Point of view of an entrepreneur
Quizzed article REF: TBA1215 V2
Preparing for execution
Préfabrication - Point of view of an entrepreneur

Author : Natacha BELLOIR

Publication date: August 10, 2022 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

2. Preparing for execution

2.1 Compliance with contract documents

The special technical specifications (CCTP) often give the contractor the option of building certain parts of the structure in concrete, either directly in situ, or using prefabricated components, on the express condition that the final structure conforms to the project and is of identical quality.

The quality of the facings and compliance with the tolerances stipulated in the CCTP, but also in the DTUs in force, are the sine qua non of this freedom to choose the construction method.

The company must then decide whether to :

  • produce the concrete elements themselves using traditional methods (formwork, reinforcement, then casting on site);

  • ...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"The building envelope"

( 77 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details