Precautions to be taken at plot level
à venir
Article REF: TBA1425 V1
Precautions to be taken at plot level
à venir

Authors :

Publication date: March 10, 2014 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Precautions to be taken at plot level

4.1 Site analysis

Carrying out a site diagnosis is an essential step in any sustainable construction project. This diagnosis enables us to list all the elements needed to exploit the site's assets and minimize its constraints with regard to the construction project. It is then advisable to draw up a map summarizing the site's assets and constraints:

  • natural areas ;

  • ecological systems ;

  • sun curve and prevailing wind direction ;

  • water tables ;

  • public transport ;

  • equipment accessibility ;

  • local material resources ;

  • ...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"The building envelope"

( 77 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details