4. Conclusion
Plaster-coated clay brick partitions have gradually been replaced by plasterboard partitions for at least four reasons:
long drying time for plaster-coated partitions before the painter's intervention;
speed of execution ;
The plasterer's trade is gradually disappearing: mixing plaster, the arduous and dirty work involved, producing a perfect plaster finish on ceilings and partitions requires a much longer apprenticeship than installing plasterboard partitions;
plasterboard and aerated concrete partitions still in short supply in homes.
The progress made in the quality of plasterboard and the possibilities offered by partition structures (sound and heat insulation) over the years has been a strong argument in their favor,...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Conclusion
Article included in this offer
"Finishing work and technical packages"
(
67 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Regulations
- Building work – Interior plasterwork – Part 1-1: standard technical specifications (STC) – Part 1-2: General material selection criteria (CGM) – Part 2: standard special administrative clauses - NF DTU 25.1 - Novembre 2010
- Building work – Mortar coating work – Part 1-1: Technical specifications – Part 1-2: General material selection criteria – Part 2: special clauses - NF DTU 26.1 - Avril 2008
- Building work – Spray...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!