Main stages in EMC system development
ECM basis of systems
Article REF: E1305 V2
Main stages in EMC system development
ECM basis of systems

Author : Florent TODESCHINI

Publication date: November 10, 2018 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

2. Main stages in EMC system development

2.1 Identify system subassemblies/equipment

This first stage, which is very preliminary since the system definition is still only at the prototype stage, aims to identify the main electrical functions and their location in the system, in fact the hard points where incompatibilities are proven or highly probable.

During this process, regular feedback between EMC and design managers is necessary to orientate the design guidelines and reduce the proximity of disruptive functions to sensitive functions. It should be pointed out that EMC constraints are not always easy to make design offices from other sectors understand/accept, even at a preliminary stage of development.

This stage requires a good knowledge of the electronics and the EMC...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Conversion of electrical energy"

( 273 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details