Additional rules for special installations
Electrical installations for construction sites and temporary facilities
Article REF: D5065 V1
Additional rules for special installations
Electrical installations for construction sites and temporary facilities

Author : Dominique SERRE

Publication date: May 10, 2010 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

7. Additional rules for special installations

7.1 Replacement power supplies

These power supplies are set up to compensate for the unavailability of normal power sources, whether such unavailability is planned or accidental. Depending on the circumstances, temporary HTA or LV connections to the public distribution network are used, or stand-alone generators.

The concern for the power to be recharged is immediate, even if circumstances impose consumption restrictions.

Secondly, we must strive to satisfy the voltage and frequency requirements of the receivers, as well as the needs of the grounding diagram.

An important point not to be overlooked, and one which is easy to forget in the rush, is the value of the short-circuit power of the replacement source, which...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Additional rules for special installations

Article included in this offer

"Electricity networks and applications"

( 184 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details