Overhead lines - Construction
Article REF: D4429 V1

Overhead lines - Construction

Authors : Robert de FORGES de PARNY, Jean-Pierre LEVÊQUE

Publication date: June 10, 1993 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

Overview

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHORS

  • Robert de FORGES de PARNY: Engineer from the École Supérieure en Électrotechnique et en Électronique - Deputy Director of the Mediterranean Engineering Department (SIM) at Électricité de France

  • Jean-Pierre LEVÊQUE: Engineer from the École Spéciale des Travaux Publics (ESTP) - Head of the Operational Division of the Networks branch of the Mediterranean Engineering Department (SIM) at Électricité de France

 INTRODUCTION

The articleAirlines is the subject of several articles:

  • Line layout and calculation ;

  • Sizing ;

  • Power transmission cables ;

  • Overhead line equipment ;

  • Construction [D 4 429] ;

  • Maintenance ;

and the subjects covered are not independent of each other. Readers will need to refer to individual articles often enough.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Electricity networks and applications"

( 184 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details