System validation tests
Railway traction - ERTMS signaling system
Article REF: D5545 V1
System validation tests
Railway traction - ERTMS signaling system

Authors : Olivier PIGNAL, Hubert THOUVENOT

Publication date: May 10, 2007 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. System validation tests

Based on the experience of a pre-series base run in 2000-2002, it was decided to divide the validation of the ERTMS system into four phases:

  • a platform and simulator phase (figure 13 );

  • a phase with a test train, but on a site limited in length and speed (figure 14 );

  • a phase with the test train on a 40 km site at a maximum speed of 160 km/h, with the possibility of simulating trains running ahead of the test train;

  • a phase on the actual LGV site.

The test platform with its equipment, edges, floors and environmental simulators was included...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Electricity networks and applications"

( 184 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us