2. Anticipation of networks to accommodate renewable energies via S3REnRs
Regional grid connection schemes for renewable energies (S3REnR) were introduced by the "Grenelle 2" law and implemented by its implementing decree of April 20, 2012.
Drawn up by the network operators and validated by the regional prefect, they reflect the regional climate, air and energy plans (SRCAE), which set targets for the development of renewable energies (RE) in each administrative region.
The S3REnR is an effective tool for optimizing and anticipating the network upgrades needed to accommodate renewable energies, by offering them reserved capacity over the long term (10 years from publication of the plan) and visibility on the costs and timescales of these network upgrades.
Indeed, the creation of HV links, as well as the creation or reinforcement of source substations, are necessary to accommodate all the...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Anticipation of networks to accommodate renewable energies via S3REnRs
Article included in this offer
"Electricity networks and applications"
(
184 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!