3. Workshop design
3.1 Problem definition
Before we can tackle the scheduling problem, we need to have answered the following questions:
What products will be manufactured?
What will be the production level?
How will the products be manufactured?
What facilities will be installed?
They are at the heart of the problem of designing a discontinuous workshop, which can be formulated as follows.
Definition of the batch shop design problem
In view of the following factors :
a set of...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Unit operations. Chemical reaction engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Workshop design
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference