2. Process for taking risk levels into account in the design phase
2.1 Integrated prevention
Integrated prevention involves applying safe design principles to future work equipment as early as possible and ISO 6385. It sets designers the objective of obtaining the lowest possible level of residual risk, given the state of the art (figure 3 ). This...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Process for taking risk levels into account in the design phase
Article included in this offer
"Unit operations. Chemical reaction engineering"
(
337 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
- (1) - NEUMANN (W.P.), WINKELHAUS (S.), GROSSE (E.H.), GLOCK (C.H.) - Industry 4.0 and the human factor (2020) A systems framework and analysis methodology for successful development, - International Journal of Production Economics, Elsevier, online nov. 2020, https://doi.org/10.1016/j.ijpe.2020.107992...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!