Process for taking risk levels into account in the design phase
Health and safety problems in the frame of the factory of the future paradigm
Quizzed article REF: SF150 V1
Process for taking risk levels into account in the design phase
Health and safety problems in the frame of the factory of the future paradigm

Authors : Patrick MARTIN, Bruno DAILLE-LEFEVRE, Xavier GODOT, Jacques MARSOT

Publication date: July 10, 2022, Review date: February 29, 2024 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

2. Process for taking risk levels into account in the design phase

2.1 Integrated prevention

Integrated prevention involves applying safe design principles to future work equipment as early as possible and ISO 6385. It sets designers the objective of obtaining the lowest possible level of residual risk, given the state of the art (figure 3 ). This...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Unit operations. Chemical reaction engineering"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details