5. Economic aspects
5.1 Investment costs
For a plant with a capacity of 100,000 to 200,000 t / year, the investment cost is between one-third and one-half that of a continuous caster 1.2.2 .
It includes the following main items:
infrastructure (buildings, overhead cranes, etc.) ;
...