Understanding incoming inspection
Controlling the physico-chemical treatment of waste
Practical sheet REF: FIC1486 V1
Understanding incoming inspection
Controlling the physico-chemical treatment of waste

Author : Nicolas KIEFER

Publication date: January 10, 2025 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Understanding incoming inspection

4.1 SUD operating conditions

On arrival at the UIDD, your waste will undergo checks to verify :

  • the existence of a certificate of prior acceptance ;

  • the presence of a hazardous waste tracking form;

  • the presence of monitoring documents relating to the control of shipments of waste into and out of the European Community, where applicable;

  • load weighing ;

  • chlorine, fluorine, sulphur, heavy metals, PCB-PCT and PCP content;

  • calorific value ;

  • analysis of any other admission parameter set by the prefectoral decree authorizing the incineration...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Understanding incoming inspection

Article included in this offer

"Chemical risk prevention manager"

( 219 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us