8. Our advice
8.1 Check that the MMR performs well
Before valuing an MMR in the face of an accident scenario, it is important to check that the MMR is "efficient".
In the context of EDDs, article 4 of the PCIG decree of September 29, 2005 specifies that: "To be taken into account in the probability assessment, risk control measures must be effective, have implementation kinetics in line with those of the events to be controlled, and be tested and maintained in such a way as to guarantee the continuity of the aforementioned positioning". If this is not demonstrated in the ESD, the DREAL may decide not to include MMR in the assessment of the scenario's probability.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Our advice
Article included in this offer
"Chemical risk prevention manager"
(
218 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!