Practical sheet | REF: FIC0543 V1

Hazard studies: risk control measures (barriers)

Author: Olivier IDDIR

Publication date: September 10, 2012, Review date: November 27, 2016 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


8. Our advice

8.1 Check that the MMR performs well

Before valuing an MMR in the face of an accident scenario, it is important to check that the MMR is "efficient".

In the context of EDDs, article 4 of the PCIG decree of September 29, 2005 specifies that: "To be taken into account in the probability assessment, risk control measures must be effective, have implementation kinetics in line with those of the events to be controlled, and be tested and maintained in such a way as to guarantee the continuity of the aforementioned positioning". If this is not demonstrated in the ESD, the DREAL may decide not to include MMR in the assessment of the scenario's probability.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Chemical risk prevention manager

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Our advice