4. Analyze risks in design and development projects
Risk analysis is an important part of design and development. If these risks are taken into account during the product and service definition phases, they will be easier to control than if they were considered at a later stage. The key is therefore to assess them and decide on actions based on a threshold of acceptability. These risks may affect the product throughout its life cycle, in terms of functionality, safety and reliability of use.
One of the most frequently used methods is Failure Mode, Effect and Criticality Analysis (FMEA), see Understanding FMEA
This tool can be applied to processes, manufacturing resources, products or projects. The first step is to consider all possible failure modes, then evaluate them according to criteria such...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Analyze risks in design and development projects
Article included in this offer
"Design and engineering management"
(
337 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!