2. Search for influential technical parameters
Once the database has been established, it will be necessary to understand which technical parameters will have an impact on project costs. Two or three parameters may suffice to establish a relationship for calculating the cost.
These parameters will enable us to clearly identify the technical characteristics of the project in order to distinguish its specificity.
The following examples illustrate influential parameters in a number of industrial and service sectors.
In civil engineering, the number of cubic meters of concrete and the mass of reinforcement used are two influential parameters.
When it comes to electrical installation, the length of cables classified by cross-section and the length of cable trays, as well as the length and volume of electrical...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Search for influential technical parameters
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference