Constructive measures
Water storage: concrete structures - Constraints and sizing
Article REF: C3671 V1
Constructive measures
Water storage: concrete structures - Constraints and sizing

Authors : Bruno DUCROT, Bernard FARGEOT, Gérard MATHIEU

Publication date: February 10, 1998 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

6. Constructive measures

6.1 Reinforced concrete structures

Under no circumstances may the provisions adopted be less stringent than the minimum provisions given in the BAEL rules.

In addition, for Class A, B and C tank walls with adhering waterproofing, with the exception of inverts resting on the ground (see § 6.1.3 ), the following provisions supplement or modify the requirements of the BAEL rules.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Constructive measures

Article included in this offer

""

( 81 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details