4. Performance criteria
4.1 In scheduling
The quality of a scheduling solution is based on three main sets of criteria.
-
Product-oriented" criteria based on completion times :
minimization of total manufacturing time or makespan ;
minimizing maximum product residence time;
minimizing average product residence times.
-
Equipment-oriented" criteria based on equipment inventory and use:
equipment utilization rate ;
the number of work-in-progress (WIP) ;
the minimization...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Drugs and pharmaceuticals
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Performance criteria
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference