Workshop design
Design and scheduling of Pharmaceutical Manufacturing Facilities - Towards modular processes
Article REF: AG3010 V2
Workshop design
Design and scheduling of Pharmaceutical Manufacturing Facilities - Towards modular processes

Author : Catherine AZZARO-PANTEL

Publication date: September 10, 2025 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Workshop design

3.1 Problem definition

Before we can tackle the scheduling problem, we need to have answered the following questions:

  • What products will be manufactured?

  • What will be the production level?

  • How will the products be manufactured?

  • What facilities will be installed?

They are at the heart of the problem of designing a discontinuous workshop, which can be formulated as follows.

Definition of the batch shop design problem

In view of the following factors :

  • a set of...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Drugs and pharmaceuticals"

( 123 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details