Article | REF: D5545 V1

Railway traction - ERTMS signaling system

Authors: Olivier PIGNAL, Hubert THOUVENOT

Publication date: May 10, 2007 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!

Automatically translated using artificial intelligence technology (Note that only the original version is binding) > find out more.

    A  |  A

    7. ERTMS lines in service or under construction

    In September 2006, several lines in Europe were equipped with ERTMS and are now in service:

    • Italy: the Rome-Naples line has been operating with ERTMS level 2 since December 2005;

    • Spain: the Madrid-Lérida high-speed line is equipped with ERTMS level 2 superimposed on ERTMS level 1. Level 1 has been in service since spring 2006, and is used by all high-speed trains. Level 2 will be introduced at a later date;

    • Switzerland: ERTMS level 2 has been in service on the Mattstetten-Rothrist line since July 2006;

    • in Luxembourg: ERTMS level 1 is in service on some sections;

    • in Germany: the Berlin-Halle-Leipzig ERTMS level 2 line operates in superposition with lateral signalling.

    Many...

    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    Railway systems

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    ERTMS lines in service or under construction