5. Integrating the threat as a system variable
5.1 Prevention for protection
Risk is characterized by its potentiality (or probability) and its impact; by prevention we limit its probability, and by protection we limit its impact. If risk analysis reveals probable feared impacts, then a preventive and palliative policy needs to be put in place.
5.2 Detect to act
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Integrating the threat as a system variable
Article included in this offer
"Control and systems engineering"
(
143 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!