2. Project sites
The project involves more than twenty sites. While some have very similar processes, they can also be very different. So we're in no way talking about an "identical" deployment. To illustrate this a little better, we'll take two examples from among the sites installed, and give an idea of the different levels of automation encountered at different sites.
2.1 Meat grinding process
A crushing production order (PO) is used to crush the raw materials (RM) from the bins stored in...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Project sites
Article included in this offer
"Control and systems engineering"
(
143 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
- (1) - SCHOLTEN (B.) - The road to integration: A guide to applying the ISA-95 standard in manufacturing - (2007).
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!