1. Inform the administration of the cessation of activity
When a classified facility subject to declaration is permanently shut down, the operator must notify the Prefect of the date of shutdown (article R. 512-66-1 of Code de l’environnement ).
1.1 When is notification required?
The operator must inform the Prefect at least one month before ceasing operations.
SCROLL TO TOP1.2 What is the content of the notification?
...