2. Project implementation and actions taken
2.1 Territorial animation technique
2.1.1 Emergence of the project
In 2019, the regional health agency (ARS) issued a formal notice to the municipality of Chesley to remove a ford located at the municipal water intake. This ford could pose a risk of contamination to the water table in the event of passage by the wheels of agricultural machinery after treatment, accidental leaks, etc. This crossing was located on a strategic traffic route and provided access to a cluster of agricultural plots. It could not therefore...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Ecological engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Project implementation and actions taken
Bibliography
- (1) - ROLAN-MEYNARD (M.) et al - Guide pour l'élaboration de suivis d'opérations de restauration hydromorphologique en cours d'eau. - Agence française pour la biodiversité. Collection Guides et protocoles. 189 pages (2019).
Other work
Regulations
Article L. 151-37 of the Rural Code (known as the "Warsmann" law)
Section 3.3.5.0 of the Environmental Code
Directory
Organizations – Federations – Associations (non-exhaustive list)
Federative Association of Ecological Engineering and Engineering Professionals (A-IGÉco):
Armançon Watershed Joint Association (SMBVA):
...Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference