Agroecological restoration of the Landion watershed - From the restoration of the river towards agricultural practices favorable to drinking water
Shared expertise REF: REX302 V1

Agroecological restoration of the Landion watershed - From the restoration of the river towards agricultural practices favorable to drinking water

Authors : Mélanie DE WAELE, Matthias ALLOUX

Publication date: March 10, 2024 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

Overview

ABSTRACT

To return the Landion river to a more natural and functional course, a large-scale hydromorphological restoration was carried out on more than 4 km of river, restoring ecological continuity.

At the same time, farmers cultivating land in the commune of Chesley have opted for organic farming on nearly 500 hectares of land. This change in farming methods should make it possible to secure and even improve the quality of the communal water support.

This operation to restore aquatic ecosystems and support farming in the Aube region is unprecedented in its scale and setup.

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHORS

  • Mélanie DE WAELE: Agricultural facilitator - SMBVA (Armançon Watershed Joint Association), Tonnerre, France

  • Matthias ALLOUX: Project manager and project supervisor for ecological engineering works - SMBVA (Armançon Watershed Joint Association), Tonnerre, France

 INTRODUCTION

The Armançon Watershed Joint Association (SMBVA) has been working for many years to implement ambitious projects to restore aquatic environments using nature-based solutions (NBS), aware of the benefits this brings in terms of climate change adaptation.

The restoration of the Landion and the adaptation of agricultural practices at the Chesley catchment area are fully in line with this framework and dynamic. In 2017, the SMBVA launched a large-scale regional initiative aimed at restoring the headwaters of the Landion watershed. This watercourse, which has been significantly altered by hydraulic works, is still home to a fragile population of brown trout. This initiative quickly bore fruit with the completion of an initial project in 2019, which enabled the hydromorphological restoration of a 530-meter stretch of the Landion in the center of Étourvy (Aube), as well as the restoration of ecological continuity at the En-haut mill in the same municipality. With the same aim of opening up the headwaters of the watershed and thus restoring the ecological continuity of the Landion, a weir removal operation was carried out in 2020 at the En-bas mill, also in the municipality of Étourvy.

The operation described in this article begins immediately downstream from the En-bas mill. In three years, at this head of the watershed, the SMBVA has restored 6.2 km of rivers and removed all obstacles to flow.

Key points

Field: Environment

Companies concerned: Local authorities, civil service

Technologies/methods involved: Ecological engineering, nature-based solutions, facilitation, project management

Sectors: Aquatic environments, agriculture

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


KEYWORDS

biodiversity   |   hydromorphological restoration   |   agroecology   |   protection of water resources

Ongoing reading
Agroecological restoration of the Landion watershed

Article included in this offer

"Ecological engineering"

( 55 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us