3. Review and outlook
3.1 Initial results
A significant number of pre- and post-construction monitoring indicators have been selected for this operation (table 4 ). Some of these are currently being collected, making it difficult to communicate scientifically substantiated data.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Ecological engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Review and outlook
Bibliography
- (1) - ROLAN-MEYNARD (M.) et al - Guide pour l'élaboration de suivis d'opérations de restauration hydromorphologique en cours d'eau. - Agence française pour la biodiversité. Collection Guides et protocoles. 189 pages (2019).
Other work
Regulations
Article L. 151-37 of the Rural Code (known as the "Warsmann" law)
Section 3.3.5.0 of the Environmental Code
Directory
Organizations – Federations – Associations (non-exhaustive list)
Federative Association of Ecological Engineering and Engineering Professionals (A-IGÉco):
Armançon Watershed Joint Association (SMBVA):
...Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference