4. Material-water balance for an industrial boiler
Just as an energy balance must be drawn up to assess boiler efficiency, material efficiency must be drawn up to assess the quantity of water lost (continuous blowdown + bottom blowdown) in relation to steam production.
Figure 6 describes the water cycle in a steam production circuit.