2. Material rotation study
The formwork-tool routing will depend on the type of site: number of buildings to be erected, one after the other or at the same time, differences between buildings. This may result in different paths being taken. There are two possibilities: closed or open rotation.
SCROLL TO TOP
2.1.1 Closed rotation
Let's take the example of a building site comprising several buildings A, B, C, D. The schedule provided by the architect in the tender documents, or the work schedule submitted...