3. Production rates and cycle times
The formwork and concrete measurements are completed, and the choice of open or closed rotation for the structural work is made. A response is given to the particular points of the description respected...
The times for the elementary tasks are selected either from a database, or from site feedback of actual execution times.
The next step is to draw up the execution schedule:
the site is subject to the BIM method;
the worksite is part of a whole subject to SPS coordination; the companies are called together by a TCE planner who asks them for details of the tasks and their completion times, in order to draw up a comprehensive Gantt schedule based on PERT or SEMA planning (either "potential-stage" or "potential-task" planning). All discussions lead to agreement, and the critical path is defined and accepted.
Before starting...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Production rates and cycle times
Bibliography
Also in our database
-
SERIN (P.) - Cycle de réalisation d'ouvrages. Rotation du matériel. - [TBA 525v2]...
Websites
Organisme professionnel de prévention du bâtiment et des travaux publics OPPBT http://www.oppbt.fr
Ministry of Labor http://travail-emploi.gouv.fr/sante-au-travail/
Caisse nationale d'assurance maladie – Recommendations
Events
Batimat Reed Expositions
International construction show held every two years in Paris (odd-numbered years). http://www.batimat.com
Standards and norms
- Temporary perimeter guardrails – Product specification – Test methods - NF EN 13374 - 07-13
Regulations
European Directive No. 92-57 of June 24, 1992 concerning the minimum safety and health requirements to be implemented at temporary or mobile construction sites
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!