4. Stripping time
The waiting time for concrete to dry after concreting and be removed from the formwork depends on the desired strength of the concrete, in order to avoid :
The waiting time before stripping the formwork is therefore of prime importance, and plays a part in the formwork rotation time.
This must be defined at the outset of the formwork rotation study. Indeed, if for a daily re-use, the quantity of formwork required to keep up with the rate is "Q", in the case where the concrete will require the formwork to remain in place for an extra day, the quantity of formwork, to keep up with the rate, must double.
So, for the same execution time of a unit of work, the cost of formwork materials...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Stripping time
Bibliography
Also in our database
-
SERIN (P.) - Cycle de réalisation d'ouvrages. Rotation du matériel. - [TBA 525v2]...
Websites
Organisme professionnel de prévention du bâtiment et des travaux publics OPPBT http://www.oppbt.fr
Ministry of Labor http://travail-emploi.gouv.fr/sante-au-travail/
Caisse nationale d'assurance maladie – Recommendations
Events
Batimat Reed Expositions
International construction show held every two years in Paris (odd-numbered years). http://www.batimat.com
Standards and norms
- Temporary perimeter guardrails – Product specification – Test methods - NF EN 13374 - 07-13
Regulations
European Directive No. 92-57 of June 24, 1992 concerning the minimum safety and health requirements to be implemented at temporary or mobile construction sites
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!