1. File review
The search for a formwork rotation can be undertaken methodically, by going through a number of stages and then, at the end of each one, coming up with precise answers according to the work to be carried out.
The method adopted consists in presenting each stage in general terms, then providing answers based on the specific nature of a concrete project (structural work on "traditional" buildings with reinforced concrete and reinforced concrete structures).
NoteAlongside the general text, there are passages that describe the example, its characteristic features and the answers provided. These answers are "possible" solutions, not "the" solution, because the conditions specific to each project influence the possible choices....
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
File review
Bibliography
Also in our database
-
SERIN (P.) - Cycle de réalisation d'ouvrages. Rotation du matériel. - [TBA 525v2]...
Websites
Organisme professionnel de prévention du bâtiment et des travaux publics OPPBT http://www.oppbt.fr
Ministry of Labor http://travail-emploi.gouv.fr/sante-au-travail/
Caisse nationale d'assurance maladie – Recommendations
Events
Batimat Reed Expositions
International construction show held every two years in Paris (odd-numbered years). http://www.batimat.com
Standards and norms
- Temporary perimeter guardrails – Product specification – Test methods - NF EN 13374 - 07-13
Regulations
European Directive No. 92-57 of June 24, 1992 concerning the minimum safety and health requirements to be implemented at temporary or mobile construction sites
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!