8. Service design, construction and transition
Within this family of processes, ISO/IEC 20000 requires the service provider to master the three processes described below.
The service provider must ensure that all changes are under control. This means that :
they have been evaluated;
they have been approved by the relevant authorities;
they are implemented in compliance with procedures;
they are reviewed to assess their effectiveness.
Negative impacts on service must be minimized.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Service design, construction and transition
Bibliography
Also in our database
-
PINET (C.) - Qualité du logiciel : référentiels normatifs. - [H 4 028] (2001).
...
Standards and norms
- Information Technology - BSI BS 15000 - 2000
- Lignes directrices pour l'audit des systèmes de management - ISO 19011 - 2018
- Quality management systems – Basic principles and vocabulary - NF EN ISO 9000 - 2015
- Quality management systems – Requirements - NF EN ISO 9001 - 2015
- Information Technology – Service management – Part 1: Service management system requirements - NF ISO/IEC 20000-1...
Directory
Information Technology Service Management Forum (itSMF France) https://www.itsmf.fr/
Information Systems Examination Board https://www.bcs.org/
Examination Institute https://www.exin.com/
British Standard Institute (BSI)...
Annex 1: Summary of ISO/IEC 20000 – Part 1
1 – Field of application
1.1 General information
1.2 Application
2 – Normative references
3 – Terms and definitions
3.1 Terms specific to management system standards
3.2 Terms specific to service management
4 – Organizational context
4.1 Understanding the organization and its context
4.2 Understanding stakeholder needs and expectations
...
Annex 2: Summary of ISO/IEC 20000 – Part 2
1 – Field of application
1.1 General information
1.2 Application
1.3 Structure
2 – Normative references
3 – Terms and definitions
4 – Organizational context
4.1 Understanding the organization and its context
4.1.1 Required activities
4.1.2 Explanations
4.1.3 Additional information
4.2 Understanding stakeholder needs and expectations
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!