2. Technical packages
-
Clause A: Technical lots assumed by the prime contractor
The technical lots assumed by the main contractor are described below:
… ;
… .
-
Clause B: Technical packages assumed by the customer
Other technical packages not expressly described in clause A above are the responsibility of the Customer.
General comments on the technical lots:
The text has to be drawn up on a case-by-case basis.
The technical areas for which the project manager is responsible must...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Technical packages
Article included in this offer
"Design and production"
(
139 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources