Practical sheet | REF: FIC1161 V1

Implement an ISO 14001-compliant environmental management system

Author: Olivier RESTOUEIX

Publication date: February 10, 2013 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


3. Phase 2: Do

3.1 Resources, roles and responsibilities and authority – ISO 14001 chapter 4.4.1

The company needs to define its organizational structure and the responsibilities of each employee with regard to the environment at all levels, from management to the field.

A member of the management committee must be appointed to maintain and implement the system, and to ensure that it is under control and constantly improving.

In practical terms, roles and responsibilities can be defined by means of function sheets, which set out environmental missions (validation of a waste tracking form, use and storage of chemical products, etc.). Authorities can be defined through an organization chart, specifying who has the authority to stop a polluting process....

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Safety and risk management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Phase 2: Do