8. EPRI's Streamlined RCM method
8.1 Origin and background
In the USA, some operators of thermal or nuclear power plants who had opted for a conventional MBF implementation found that its implementation was very costly in terms of financial resources and personnel, and that the return on investment was not always forthcoming. This is why attempts have been made by consulting firms and specialized institutes, with varying degrees of success, to lighten the formal MBF procedure while retaining its fundamental principles. Among the methods described as "streamlined" or "simplified", the most widely recognized is that developed by EPRI (Electric Power Research Institute). This research organization is funded mainly by American operators, with support from operators in other countries. This section describes EPRI's Streamlined...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
EPRI's Streamlined RCM method
Article included in this offer
"Safety and risk management"
(
460 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!