PMO (Plant Maintenance Optimization) method
Reliability and risk-based maintenance methods
Article REF: SE1650 V1
PMO (Plant Maintenance Optimization) method
Reliability and risk-based maintenance methods

Author : Gilles ZWINGELSTEIN

Publication date: July 10, 2015 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

9. PMO (Plant Maintenance Optimization) method

9.1 Origin and background

The Plant Maintenance Optimisation (PMO) method was developed in the late 1990s by Steve Turner . The origin of his PMO method stems from his frustration with the results obtained with conventional MBF in traditional industrial sectors. As a result of the expertise he had acquired through the application of MBF, he identified recurring weaknesses in the majority of preventive maintenance programs:

  • traditional maintenance...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
PMO (Plant Maintenance Optimization) method

Article included in this offer

"Safety and risk management"

( 460 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us