In-service testing and monitoring of the enclosure
Containment. Enclosures
Article REF: B3290 V2
In-service testing and monitoring of the enclosure
Containment. Enclosures

Author : Jean‐Louis COSTAZ

Publication date: April 10, 1997 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

7. In-service testing and monitoring of the enclosure

7.1 Mechanical strength test

Before the unit is commissioned, the PWR 900 enclosure and the inner wall of the PWR 1,450 enclosure are subjected to a test by pressurizing the interior atmosphere with dry air at ambient temperature. The effective pressure is equal to the design pressure p for PWR 1,300-1,450, and 1.15 p for PWR 900, to account for the action of the metal skin in the event of a LOCA, as its expansion is counteracted by the concrete, which remains cold.

In operation, no resistance tests are planned. However, a complete survey of the monitoring devices is carried out during the periodic overall watertightness tests.

In addition, measurements are taken at intervals of around 3 months to monitor the evolution of the structure...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Nuclear engineering"

( 160 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details