5. How do you acquire the equipment needed to install CNG infrastructures?
Detailed programming and meticulous planning are essential for the successful installation of CNG infrastructures. Delivery times for all components (some of which can be long) must be factored into the planning.
It is therefore necessary to acquire the equipment as quickly as possible in order to meet the installation schedule, and even better, the plant operator expects the stations to be installed much more quickly than is possible with the current schedule.
This means choosing reliable CNG infrastructure suppliers who work with their supply chains to reduce component delivery times. This suggests the need for suppliers to hold stock at some point in the supply chain.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
How do you acquire the equipment needed to install CNG infrastructures?
Article included in this offer
"Energy resources and storage"
(
210 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!