6. How do you prepare the site, install the CNG equipment on site, commission it, operate and maintain the installation?
6.1 What does site preparation, CNG equipment installation and commissioning entail?
Beforehand :
prepare the site (brush clearing, land clearing, site demarcation) ;
organize the site ;
set up the base and security ;
civil engineering and external works (foundations, earthworks and decontamination, roads, networks and landscaping, fences and gates);
carry out electrical engineering work (cable trays, power supply).
Then, for the CNG infrastructure installation phase, the recommendations are as follows.
Agree roles...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
How do you prepare the site, install the CNG equipment on site, commission it, operate and maintain the installation?
Article included in this offer
"Energy resources and storage"
(
210 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!