1. How do you go about designing CNG infrastructures, estimating budgets and planning installations?
The design of CNG stations requires the customer to recruit engineers experienced in CNG station design, or to call on the services of a design office qualified in CNG project engineering.
Designing and planning the installation of CNG infrastructures requires several phases in the following chronological order:
size the quantity of natural gas needed to refuel the station and recharge CNG vehicles and store it on site;
create the PID (pipe instrumentation diagram) of the plant in 2D and 3D, using software such as Autocad and SolidWorks, while incorporating safety aspects into the plant design;
carry out civil engineering and electrical circuit design studies for the installation;
consult CNG station supplier-installers...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
How do you go about designing CNG infrastructures, estimating budgets and planning installations?
Article included in this offer
"Energy resources and storage"
(
210 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!