3. Implement best practices when executing the metering plan
Regular monitoring of CAI requires the collection of data to feed dashboards. This data will be of two kinds:
energy consumption: the meters needed to collect this data must be installed at the selected metering point;
values or quantities of influencing factors.
The quality of measurements is a key success factor in the deployment of a counting plan. Reliable readings are essential for making the right decisions on the basis of the IPEs set up and observed.
Choose the following options:
look for low measurement uncertainty in the counts set up to identify variations in CAIs representative of operating conditions;
The right choice of meters and the precautions taken...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Implement best practices when executing the metering plan
Article included in this offer
"Energy resources and storage"
(
210 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Downloadable tools
The different sensors for energy metering
This tool describes, for each metering technology, the fuel involved, the distribution and storage method, the meter selection method, and the cost...
Exclusive to subscribers. 97% yet to be discovered!