Performance and yield verification
Boiler design and calculation: behavior and performance

Add to my library

B1463 V1 Article

Performance and yield verification


Boiler design and calculation: behavior and performance

Author : Jean PARISOT

Publication date: August 10, 1993 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

2. Performance and yield verification

Standard practice is to check that the equipment supplied delivers the contractually agreed performance.

The manufacturer generally has a certain amount of time (1 to 2 months) to fine-tune his equipment and carry out adjustments, after which acceptance tests are carried out.

These tests cover at least :

  • achieving maximum speed;

  • obtaining :

    • of boiler outlet pressure,

    • superheated and reheated steam temperatures in the pages provided,

    • good combustion quality,

    • guaranteed performance (at one or more speeds) ;

  • and, more generally, on the verification of contractual stipulations, which...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Performance and yield verification

Article included in this offer

"Industrial thermal engineering"

( 38 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Tous les livres blancs
Article Les pompes à chaleur restent à privilégier
17 October 2025
Les pompes à chaleur restent à privilégier

Les pompes à chaleur, dont le développement important va probablement encore se renforcer, ont-elles des performances satisfaisantes ? Une étude de l’Ademe fait...

Toutes les actualités
Contact us