2. Collection
2.1 Emptying: best practices
Oil changes must be carried out by an approved professional.
Periodic checks should be carried out to verify the thickness of deposits at the bottom of the pit. If this deposit occupies around two-thirds of the total depth between the liquid level and the invert (bottom), you should schedule an emptying operation as soon as possible.
Important recommendations
It's important to keep an eye on this height, because septic tanks can continue to "work" when they're almost full. In fact, the liquid then makes its way through the deposit, instead of staying in the tank. Pre-treatment is then non-existent.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Collection
Article included in this offer
"The finishing and equipment of the building"
(
90 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!