Bearing at the head of the installation
Urban wastewater treatment - Concepts, pumping and pretreatment facilities
Quizzed article REF: C5220 V3
Bearing at the head of the installation
Urban wastewater treatment - Concepts, pumping and pretreatment facilities

Author : Jean-Marc BERLAND

Publication date: April 10, 2024 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Bearing at the head of the installation

When a wastewater treatment plant is built, designers are most often obliged to install a lift station, for the following reasons in particular:

  • site topography :

    • Is the terrain suitable for gravity flow of collected ERU?

    • Is the ERU source at a lower altitude than the STERU?

  • hydraulic constraints :

    • when ERU are transported over long distances with variations in elevation, gravity flow may be insufficient,

    • lift stations regulate flows by temporarily accumulating ERU and then pumping it out at a constant rate;

  • sewer network configuration: in a complex urban wastewater system, several networks may converge on a single...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Public works and infrastructure"

( 88 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us