3. Bearing at the head of the installation
When a wastewater treatment plant is built, designers are most often obliged to install a lift station, for the following reasons in particular:
-
site topography :
Is the terrain suitable for gravity flow of collected ERU?
Is the ERU source at a lower altitude than the STERU?
-
hydraulic constraints :
when ERU are transported over long distances with variations in elevation, gravity flow may be insufficient,
lift stations regulate flows by temporarily accumulating ERU and then pumping it out at a constant rate;
sewer network configuration: in a complex urban wastewater system, several networks may converge on a single...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Bearing at the head of the installation
Article included in this offer
"Public works and infrastructure"
(
88 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!