Conclusion
Construction cycle. Shuttering, concreting and stripping

Add to my library

TBA526 V1 Article

Conclusion


Construction cycle. Shuttering, concreting and stripping

Author : Pierre SERIN

Publication date: May 10, 2017 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Conclusion

The study of formwork rotation is very important because formwork is expensive: any error is costly and leads to a loss of time. You also need to take into account the setting time of the concrete, which enters into the calculation of the rotation cycle. This study can make or break a project, which is important for the life of the company. Every extra hour spent studying specific points saves the job site around 10 to 20 hours. Using too much formwork equipment prevents the site from being profitable, but if you don't have enough equipment, you risk delay penalties.

SCROLL TO TOP
You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Preparing for construction"

( 117 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
WhitePaper
17 March 2020
Les bétons auto-plaçants

Les bétons auto-plaçants constituent la dernière évolution en date des bétons utilisés pour la construction d’ouvrages de bâtiment et de génie civil

Tous les livres blancs
Article Le béton sous haute pression
25 March 2019
Le béton sous haute pression

Le béton est un gros vecteur de production de C02. Depuis longtemps des bétons sont à l’étude pour réduire cette empreinte. Le but est de proposer un matériau a...

Toutes les actualités
Contact us