6. Solutions for premises accessible to the public
6.1 Terminology
Figure 7 illustrates the terminology used in smoke control rules.
Barrier screen – Vertical separation placed under the roof or high floor to prevent the lateral flow of smoke and combustion gases.
Pipes or equipment may pass through the enclosure screens with the necessary clearance tolerance.
Smoke extraction curtain wall – Free volume between the bottom floor and the top floor or roof, bounded by the smoke extraction curtain walls.
Surface area of a smoke extraction section – Surface area obtained by horizontally projecting the volume of the section.
Reference height...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Solutions for premises accessible to the public
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!