4. Site installation – Platform assembly
Site installation and platform erection must comply with the following steps:
prepare packing, delivery, means of transport and unloading;
mark out location and access paths ;
make sure the soil is load-bearing ;
install the suspension devices, taking into account the centre-to-centre distance of the winches attached to the platform stirrups;
hang cables on suspension devices, one hanging point per cable;
carefully lower the cables to the ground using a rope;
fit high limit stops (use of electric winches) ;
assemble the floor platforms vertically to the suspension devices ;
mount winches...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Site installation – Platform assembly
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!