Site installation – Platform assembly
Suspended platforms

Author : Pierre SERIN

Publication date: October 10, 2019 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Site installation – Platform assembly

Site installation and platform erection must comply with the following steps:

  • prepare packing, delivery, means of transport and unloading;

  • mark out location and access paths ;

  • make sure the soil is load-bearing ;

  • install the suspension devices, taking into account the centre-to-centre distance of the winches attached to the platform stirrups;

  • hang cables on suspension devices, one hanging point per cable;

  • carefully lower the cables to the ground using a rope;

  • fit high limit stops (use of electric winches) ;

  • assemble the floor platforms vertically to the suspension devices ;

  • mount winches...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Site installation – Platform assembly

Article included in this offer

"Preparing for construction"

( 117 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us