3. Site preparation
3.1 Preliminary study for the choice of a lifting platform and its installation
Before making any other decision, you need to carry out a feasibility study, starting with a set of specifications.
First of all, you need to know :
the type of roof (terrace, double slope, Mansard, etc.), which will determine the choice of suspension devices;
building height ;
accessibility and location for floor mounting ;
platform length ;
loads to be shipped ;
the characteristics of the energy made available.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Site preparation
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!