Operating criteria. Tunnel design
Power facilities in the Channel Tunnel
Article REF: D5055 V2
Operating criteria. Tunnel design
Power facilities in the Channel Tunnel

Authors : Gilles de KERSABIEC, Jean-Pierre DUPONT, Yves MACHEFERT-TASSIN

Publication date: November 10, 2010 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Operating criteria. Tunnel design

3.1 Operation

The power system's operating methods have been designed to ensure passenger safety as a priority, and in the event of an incident, evacuation in less than 90 minutes. See 1.2 for the fundamental principles that governed the design of the installations....

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Operating criteria. Tunnel design

Article included in this offer

"Electricity networks and applications"

( 184 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details