Conclusion
HTA Electric Installation. Implementation and Exploitation
Article REF: D5026 V2
Conclusion
HTA Electric Installation. Implementation and Exploitation

Author : Dominique SERRE

Publication date: November 10, 2016 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Conclusion

High-voltage installations have evolved in response to changing needs, technologies and operator protection regulations. As the latest edition of standard NF C 13-100 included provisions for the use of equipment that had disappeared since the 1970s, a major effort was required to update the standard.

A new approach to NF C 13-200, making it easier to read, has led to the revision of NF C 13-100. The two standards are written with a common layout, making it easier for designers and inspectors to find the rules.

The former NF C 13-100 standard was accompanied by three standards relating to semi-underground prefabricated substations, prefabricated substations and pole-mounted substations. These three standards have now been integrated.

The verification section of standard NF C 13-100 has been revised to take account...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Electricity networks and applications"

( 184 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services